Coated Materials
The Hillhouse Group operates three coating plants. These are located at our Hillhouse Quarry site at Troon and together give an unparalleled supply capacity and service delivery.
All plants are computer controlled to ensure batching accuracy and compliance with our quality schemes.
The plants produce the full range of standard Asphalt and Macadam products together with Stone Mastic Asphalts and the Hillhouse proprietary product range. All Recipe and Design mixes are catered for.
With our unparalleled flexibility of supply we welcome collect sales and target a turnaround time of no more than 35 minutes for our collect customers.
Whether it's a Motorway or a footpath we supply and lay all coated materials to the same high standards.
Hillhouse also operates its own fleet of tippers so arranging deliveries is never a problem.

